Lime Down Solar Park update and targeted consultation
See below update from the Lime Down Solar Park project team regarding a targeted consultation running from 3 June to 11 July 2025 regarding changes to the development boundary area.
To whom it may concern,
I am writing to notify you of the launch of a targeted consultation we are holding on our proposals for Lime Down Solar Park. Please see below for information on the specific proposed changes that are being consulted on.
I am also writing to provide an update that we have indicatively identified a preferred Cable Route Search Corridor as a result of an initial review of feedback, as well as further design work and findings from ongoing environmental assessments.
About the Project
Lime Down Solar Park is a utility-scale solar park and battery energy storage project proposed to be built on land in Wiltshire. The Project involves the installation of solar panels and an on-site battery energy storage facility, with an underground cable connection into the National Grid at Melksham substation. Electricity generated would be made available for homes and businesses across the UK.
If consented, the solar park could deliver up to 500 megawatts (MW) of renewable energy. This is equivalent to providing enough clean affordable electricity to power approximately 115,000 homes annually.
Targeted consultation
Following the close of statutory consultation in March 2025, we have continued to refine our plans for the Project. This has resulted in a series of minor amendments to the development boundary area for the Project compared to the boundary we consulted on during our statutory consultation (January – March 2025).
To summarise, the changes comprise:
· Six areas to enable the temporary highway and traffic works that would be required to safely accommodate the Abnormal Indivisible Load (AIL) vehicles needed during the construction phase of the Project.
· Nine areas where the proposed development boundary area has been adjusted to enable access to and within the Project site, and to avoid constraints such as woodland and hedgerows.
Although these changes are minor in nature and scale, we are committed to ensuring that relevant stakeholders are consulted on the changes prior to the application for development consent being submitted.
As a group representing the interests of local communities, we welcome any comments you have on the changes we are proposing. If you require any further information, please get in touch with our Community Relations Team via the communication lines listed at the end of this email.
Targeted consultation is open from 03 June to 11 July 2025.
This consultation is considered targeted because it focuses on the fifteen specific changes, which have resulted in small increases to the development boundary area compared to the boundary presented in the Preliminary Environmental Information Report (PEIR) for Stage Two Consultation.
As part of this targeted consultation, we are also holding an online information event on Thursday 19 June 2025, from 18:30 to 20:00 (via Zoom), where members of the public will be able to meet the Project team and find out more about the localised changes being proposed. If you would like to attend, please register to attend via the Project website (linked below) or directly by clicking here.
How to access materials and respond to this targeted consultation
Information about each of the changes we are consulting on and how you can participate in the consultation can be found on the dedicated Targeted Consultation webpage of our Project website at: www.limedownsolar.co.uk/targeted-consultation-june-2025.
An online feedback form and Information Change Note produced for the targeted consultation are available on the Project website. The Information Change Note includes an overview of the changes, maps showing the changes, and the land affected.
You can submit your comments on these proposed changes until 23:59 on 11 July 2025. Your feedback can be provided online via the Project website, in writing, or via email using the methods listed below:
· Submit an online feedback form available on the Targeted Consultation webpage (linked above) and the corresponding Targeted Consultation – Documents webpage at: www.limedownsolar.co.uk/documents-tc or directly by clicking here.
· Fill out a hard copy feedback form and send it to FREEPOST Lime Down Solar. Any written letters sent to us during the consultation period will also be considered as feedback.
· Any emails sent to info@limedownsolar.co.uk during the consultation period will also be considered as feedback, including scans of completed feedback forms.
If you are unable to provide your feedback in writing, verbal representation is also possible by appointment with the Project team (contact details listed at the end of this letter). Feedback provided will be transcribed and agreed verbally prior to submission.
If you would like hard copy targeted consultation materials (Information Change Note and feedback form), please contact us directly. These documents are also available in hard copy for you to view on-site and for pick-up and take away at the following local venues:

Hard copies of the PEIR, NTS and maps and plans from the statutory consultation remain available for inspection free of charge at two of the community venues listed above: Chippenham Library and Malmesbury Library. Details of these locations, how to request these documents and any related charges are set out in the section 48 notice that related to the statutory consultation and is available at: www.limedownsolar.co.uk/documents
Project Update – Cable Route Search Corridor
Feedback received to our second stage of consultation (January – March 2025) is informing the refinement of our plans for Lime Down Solar Park, helping us develop our proposals responsibly and in a manner that recognises local community and stakeholder views.
During our second stage of consultation, we presented a broad Cable Route Search Corridor, comprising the area in which the Cable Route Corridor would connect the Solar PV Sites to one another and to the existing Melksham Substation. We are proposing to build this connection by installing underground cable.
We continue to work to identify a location which avoids or minimises adverse effects to sensitive receptors, ecology, archaeology and other environmental impacts.
Following refinements and ongoing assessments since the Stage Two consultation, we have indicatively identified an initial preferred route and continue to assess its suitability.
To view the refined corridor and Project at this stage, please visit www.limedownsolar.co.uk/project
In addition to an updated illustrated map, we have also made available a zoomable interactive map where you can search for a postcode and see how the location relates to the Project.
Next steps
Your feedback has been important in helping us refine our plans further and we are continuing to review of all the feedback we received to our Stage Two consultation.
Your feedback, together with the outcomes of ongoing assessments and design work, will help to finalise the application for development consent, which we are expecting to submit to the Planning Inspectorate later this year. Subject to obtaining consent, the earliest construction would start is 2027.
The application we submit to the Planning Inspectorate will include a Consultation Report summarising the issues raised in feedback to consultation along with an explanation of how we have taken views into account to develop our final proposals. This report will be published on the Planning Inspectorate’s website should our application be accepted for examination.
Get in touch
Anyone with questions about the Project or requiring further information can contact the Community Relations team directly using any of the communication lines listed.
Communication Lines
· Freephone – 0808 175 6656 (open 09.00-17.00 Monday to Friday excluding bank holidays)
· FREEPOST Lime Down Solar Park